Davis Kwan 关星强 闽琍眏
My resume CERTIFICATE
I, KWAN SENG KEONG 关星强 IC:1444483 A
39 YEAR OLD.
* BLK 484-C #06-60 CHOA CHU KANG AVE-5
SINGAPORE 683484
Pg/Hp:97602977
E-mail:[email protected] ([email protected])


I, NTC-3 HOLDER (IN ELECTRICAL).
(BCSS) SAFETY SUPERVISORS CERTIFICATE HOLDER.
I Holder computer certificate
(1) AUTO CAD R13 &14 (2) IT POWER (3) IT POWER 21 (4) CHINESE STAR (中文之星) (5)HANSVISON ADVANCED (汉神) (6) MAINTENANCE & TROUBLE SHOOTING SKILLS FOR PC USERS .
Doing wiring, gland for Armour & Micc cable connection, conduit trunking cable tray and cable ladder. Installation work & Maintenance troubleshooting & repair.
My Experience

For various clients on contract basic.
1974 to 1978 I am working for Heng Chong Electrical CO. doing wiring, gland for Armour and Micc cable & connection, conduit trunking cable tray and cable ladder.
1978-1980 JAN NATIONAL SERVICE.
1980 to 1981 I am working for Instrumentation Engineering Pte Ltd (I\E), Doing Instrument installation fitting wiring,Air-piping tubing welding and cable termination. at Pulau Bukom (Shell) Refinery.
1981 to 1983 I am working for Bechtel International Inc. in INDONESIA BALIKPAPAN Pertamina Refinery. Doing Electrical & Instrument installation testing & commissioning.
1983 to 1986 I am working for Automat Engineering Pte Ltd. Doing (6.6 kV & 22 kV) York Shire Switchgear installation wiring termination testing commissioning servicing & trouble shooting.
1986 to 1989 I am working for Bicc Supentension Cable (1980) Ltd. Doing jointing & testing of (66kv & 230kv) cable & under ground cable laying supervise.
1989 to 1991 I am working for Liston Electrical Contractor Pte Ltd. Working in CHINA-SHANGHAI. The Garden Hotel. Doing electrical system testing commissioning trouble shooting repair & reinstall the new equipment.
1991 to 1992 I am working for Tekniskil (Pte) Ltd. Work in Mobil Oil Singapore Pte Ltd. Be A Instrumentation Technician, doing loop checking , function test for control circuit, servicing, repair & installation new system.
1992 Feb to Aug I am working for S&W Engineering. Work at Malaysia Shipyard (MSE) in Pasir Gudang. Doing Marine service & repair .inert gases system (IGS) hydraulic system valve control cargo pump control tank gauging master clock control & alarm system.
Mar 1992 to Aug 1993 June I am working for P-CON Automation (S) Pte Ltd. Work at Sembawang Shipyard, Nanhai West W11-4 Platform. Apr-Aug 1993 Offshore works in CHINA. Doing Armour cable laying wiring cable termination loop checking function test & commissioning.
2Apr 1994 to 31May 1996 I am working for Hazama Corporation. The Anchorage Condominium Project. Working as Construction Site (M&E) Maintenance Supervisor & Safety Supervisor. In charge of all temporary power supply ,equipment & material .Installation servicing & repair. (lighting system generator air-compressor air-con water pump blower Alimar (lift) & tower crane).
1Jun to 31Dec 1996 I am working for Kingsforce Mgt Services. Work at Singapore Aromatics Co Pte (SAC) in Pulau Ayer Chawan. Working as Electrical Technician. For Aromatics Project. co-ordination with Contractor (Foster Wheeler).Taking over the 11kv compressor 3.3kv motor (pump) & 415v motor from Foster Wheeler. & Commissioning of Sub-station 3.3kv Switchgear 3.3kv \415v Transformer 415v Switchgear & 415v Switchboard & Start up the system.( Plant )
2Jan to 27Sep 1997 I am working for Gammon-RDE Joint Venture. Working in Bukit Panjang-LRT System. Working as (M&E) Maintenance & Safety Electrician. At Worker camp Precast yard & Depot bored pile construction site .Taking charge of all temporary power supply Equipment & Material . Installation servicing & repair .Safety check of all electric hand tools.(Lighting system water-pump construction machine system trouble shooting).
1Oct 97 to 31Mar 98 I am working for Kingsforce Mgt Services. Work at Singapore Aromatics Co Pte (SAC) in Pulau Ayer Chawan. Working as Electrical Technician. Doing Maintenance job in Aromatics Plant. Motor, Pump, Soot blower, Fin fan, Heat tracing, Motor operating valve ( MOV ) and Electrical system servicing & repair .Install new system 'conduit trunking cable-tray cable-ladder micc-cable armour-cable laying & termination'
1 Apr 1998 to 20 Mar 1999 I am working for KSM Joint Venture. Work in MRT North East Line C705(Boon Keng Station). Working as (M&E) Electric maintenance, In charge of all temporary power supply material and equipment installation servicing & repair .Lighting-system water-pump cable laying connection and power supply Panel Design & installation

Yours Faithfully

Davis S.K.Kwan 9 May, 1999



 
Favourite Links
 

Email me on:
[email protected]

This page has been visited times.